
Sustainable development is the core principle behind all UK environmental legislation and regulation, particularly the climate change agenda.

Rising costs are driving organisations to manage energy (and carbon). An energy management programme controls costs and minimises risk, and the impacts of the Climate Change Levy (through Climate Change Agreements), European Union Emission Trading Scheme (EU ETS) and the CRC Energy Efficiency Scheme

In addition to energy and carbon, water, raw materials and waste are also subject to rising costs and increased regulation.

CICS, part of The Ceram Group, provides independent verification of emissions/resources for both voluntary and mandatory reporting schemes, across all business sectors:

Safe Training Systems develop and manufacture simulated training instruments for the nuclear , radiological and NDT industries.

GA5000 landfill & contaminated land gas analyser with available gas measurements of CH4, CO2, O2, H2S and CO

The recently-built power station at Pembroke in South Wales is, at 2,160MW, the largest combined cycle gas turbine (CCGT) power plant in the UK. It was recently built for RWE npower by Alstom Power Systems. Hager + Elsasser UK Ltd were contracted by Alstom to supply the process water system to feed

IRmax does not utilise heaters to prevent condensation on windows and mirrors. Instead, its optical components are treated with a highly durable hydrophobic coating called STAY-CLIR that completely prevents signal faults due to condensation.